亚洲第一区视频在线观看,国产视频国产,午夜精品在线视频,免费看黄网站在线,精品免费国产,精品国产精品,国产成人精品免费午夜

Engineering and EPC
Service support - Full life cycle services - Service product display

1, engineering explosion-proof safety assessment

New project-on-site inspection and evaluation of explosion-proof safety of new project: issue an evaluation report after evaluation;

Projects that have been put into production —— On-site inspection and evaluation of staged explosion-proof safety of projects that have been put into production;

Reconstruction and expansion project —— Adaptability and conformity between selection and construction of reconstruction and expansion project and dangerous environment ……


2, dust environmental safety assessment and explosion-proof transformation

For: places with dust explosion danger in industries such as steel and food.

Content: According to GB3836, GB12476 and other standards and process flow, identify the sources of combustible dust emission, divide the hazardous areas, and propose the selection and transformation scheme of electrical equipment, which can be implemented.

Inspection and inspection institutions with explosion-proof professional qualifications shall conduct inspection and evaluation according to GB 50257 Code for Construction and Acceptance of Electrical Equipment in Explosion and Fire Hazardous Environment of Electrical Equipment Installation Engineering. Obtain compliance safety evaluation report


3. Gas to electricity

Typical scheme

Background: Steam generated by small coal-fired boilers is used to drive steam turbines, and then high-speed air compressors, superchargers, fans and other equipment. In order to solve the environmental pollution problem of small coal-fired boilers, the steam turbine drive is directly changed to high-speed motor drive.


1609125414888065fOo1.png


Process flow of motor overhaul


圖片1.png


Construction process of maintenance and overhaul of fan


image.png